Description
EPCO LED CordLights are designed to meet the demanding needs of data center construction, expansion, and maintenance projects. They are OSHA compliant, NEC 2026 code compliant, and ETL listed, making them suitable for regulated, mission critical environments. These LED cord lights provide reliable temporary lighting for white space buildouts, equipment staging areas, raised floor work, and service corridors.
The lights are available in 50 foot and 100 foot lengths and can be linked together up to 500 feet to support long aisles and large floor plates. With IP65 weather resistant protection and durable SJTW cord construction, they hold up well in active construction zones and during early commissioning phases. High output lumen options up to 20,000 deliver clear, even illumination to support safe installation and inspection work, while energy efficient LED technology helps reduce power draw on temporary electrical systems.
BENEFITS
- ETL certified for safety: Approved under ETL Standard 153 for Portable Electric Luminaires, ensuring compliance and reliability.
- NEC 2026 code compliant: Fully meets National Electrical Code Articles 590.4(E)(F)(J), which cover temporary installations and job site electrical safety.
- Bright 5000K illumination: Each LED module delivers crisp white light for improved visibility and worker safety in construction zones or outdoor areas.
- Labor-saving installation: Quick setup with no bulbs to replace, reducing downtime and ongoing maintenance costs.
- Weather resistant for outdoor use: Rated IP65 to withstand dust, rain, and damp conditions, making them suitable for year-round use.
- Wide beam coverage: 120-degree beam angle spreads light evenly across large areas, reducing dark spots and shadows.
- Linkable system: Connect multiple LED CordLights together, extending up to 500 feet, to cover large projects with one continuous lighting solution.
FEATURES
- Commercial-grade LED modules: Built with high-power LEDs that deliver reliable brightness for construction sites, outdoor events, and commercial applications.
- Multiple length options: Available in 50-foot and 100-foot cord sets, giving contractors flexibility for both small and large job sites.
- High lumen output: Choose from 8,000 and 16,000 total lumens to match the specific lighting needs of temporary workspaces or event areas.
- Even light distribution: LED modules are spaced every 10 feet to provide consistent, uniform illumination across large areas.
- Heavy-duty cord construction: Manufactured with 18/2 or 18/3 SJTW round cord, designed to withstand tough environments and frequent handling.
- Standard 120-Volt plug-and-play design: Easy setup with a plug and receptacle that connects directly to standard power sources.
- Fast installation: Includes a carabiner coupling link that speeds up mounting and reduces labor costs on job sites.
- Added safety: Spare fuse included in the plug for built-in protection and uninterrupted lighting performance.