Customizable Data Center Temp Lights

    EPCO’s customizable temporary lights are built for the scale and speed of hyperscale data center construction. Designed to install quickly and reconfigure easily, these lights provide consistent coverage across large footprints while helping reduce labor and downtime. As layouts change and builds accelerate, EPCO lighting keeps crews productive and projects moving without compromising quality or safety.

    • High‑output illumination for large equipment halls and mezzanines.
    • Compatible with the strict safety requirements contractors must meet on large‑scale projects.
    • Customizable connectors: NEMA L7-20 277V Twist Lock, NEMA 5-15, and 120/277V Locking Plug & Connectors.
    • Compatible with SJTW cord, NM-B cable, MC cable, FMC whips when used with suitable connector.
    • 3-conductor lever nut connectors.
    • Cord Lengths from 1-ft. to 35-ft.
    • 1/2" trade size knockouts.
    • Stainless steel carabiner.
    • Bulk packaging option.
    • Easy-to-install. 
    Image
    TIGRESS Prefab Temporary LED Light Fixture 100-Watt
    Catalog Number
    15742
    UPC Number
    15742
    Item Description
    100W, 120-277V, 15,000LM, 5000K, 150LPW
    Order Unit
    EA
    Unit Quantity
    1
    Unit Package
    BX
    Unit Per Case
    4
    Total Case Quantity
    1
    Min. Order Quantity
    1
    Ship Weight
    5.00lbs.
    MM Req.
    No
    IES Image File
    Image
    TIGRESS Prefab Temporary LED Light Fixture 100-Watt
    Catalog Number
    15743
    UPC Number
    15743
    Item Description
    150W, 120-277V, 22,500LM, 5000K, 150LPW
    Order Unit
    EA
    Unit Quantity
    1
    Unit Package
    BX
    Unit Per Case
    4
    Total Case Quantity
    1
    Min. Order Quantity
    1
    Ship Weight
    7.00lbs.
    MM Req.
    No
    IES Image File

    TIGRESS Prefab Temporary Light Fixture Specifications

     P/N 15742P/N 15743
    Output Lumens15,00022,500
    Operating Voltage120-277 VAC @ 60/50 Hz
    Power Consumption100-Watts150-Watts
    Correlated Color Temperature (CCT)5000K
    Color Rendering Index (CRI)≥80
    Efficacy150 lm/W
    Operating Temperature-4°F (-20°C) to 104°F (40°C)
    EnvironmentDry or Damp Locations
    Certifications
    • ETL Listed
    • RoHS Compliant
    • ETL Listed
    • RoHS Compliant
    Power Cord Type
    • Junior Service Cord, NM-B cable, MC Cable, FMC wiring capability
    • Junior Service Cord, NM-B cable, MC Cable, FMC wiring capability
    Warranty5 Year
    IES Files (See P/N for file in .ies format)
    Image
    Image

     

     

    Engineered Products Company (herein known as EPCO) warrants at its sole option, after a failure is confirmed as a true defect in materials or workmanship, EPCO will replace or refund, the TIGRESS Prefab Temporary Light Fixtures for a period of five (5) years from original purchase. This warranty statement applies to the original purchaser and is not transferable. If the product fails before the 5-year period expires, please return this product with your original invoice to: Engineered Products Company, Attention: Return Materials Department, 5401 Smetana Drive, Minnetonka, Minnesota 55343. 

    This Limited Warranty does not apply to any of the following: 

    • Any TIGRESS Prefab Temporary Light Fixtures that was incorrectly installed by drilling holes, puncturing, piercing or any other means that will alter the product’s integrity.
    • Damage caused by the use of parts, components, and/or other equipment(s) that is not compatible, suitable, or unauthorized by EPCO for use with any TIGRESS Prefab Temporary Light Fixture.
    • Damage resulting from the use of any TIGRESS Prefab Temporary Light Fixture in what EPCO, at its sole discretion, considers extreme applications.
    • Product damage as determined by EPCO to be caused by a crash, impact, or obvious signs of abuse to any TIGRESS Prefab Temporary Light Fixture.